Download¶
The track is free. One zip has the track and the locator app; drop it on Content Manager and you're done. New here? Read Getting started first.
DC Capital Beltway M5.13.2 Current build¶
2026-11-24 · Cleanup pass 3 of 3: wayfinding (lines at joins, exit signs, rail between directions), QA respin 2
Download M5.13.2 (2.0 GB) How to install
Hosting a server? Server kit for M5.13.2 (3 KB: server_cfg.ini, entry_list.ini, README). See Multiplayer.
What's new in this build
- QA respin 2 of m5.13 (fixes from the m5.13.1 re-shoot; everything else as m5.13.1).
- Lane edge colour: a painted line took the colour of its first point for its whole length, so left edges stayed white or yellow for kilometres past where they should change. Each line now changes colour where it should: 51 km of left edge turns white to yellow (the longest a 36 km median edge from Springfield over the Wilson Bridge to Landover), 17 km yellow to white (the painted buffer between the outer-loop general lanes and the Express near Gallows Road and Tysons).
- Overhead signs: the 13 exit and advance signs lost in m5.13.1 (31A Wheaton, 28A White Oak, 28B Takoma Park, 176B Telegraph Road, the three I-395 exits at the Pentagon, and advance signs for 47A-B, 8A, 4, 5, 7A and 1C/1D) are back, still with no post in line with other pavement: where the usual spots had none, the sign moves upstream (356 overhead signs). The Pentagon exit signs stand 285-300 m before their exits, ahead of the approach bridge (posts cannot go on a bridge).
Earlier builds¶
Every build stays available, so you can match a server or go back if a new one breaks something you liked. Installing one replaces the build you have (they share the dc_beltway folder). Older zips include the locator app only where marked †: elsewhere use the current one (its teleports may be a little off on roads that changed since).
| Build | Date | What changed | Download |
|---|---|---|---|
| M5.13.1 | 2026-11-24 | QA respin: no ramp-end wedge above Georgia Avenue (31A); no gantry post at a gore nose (4A); left edge yellow where the Express is a separate roadway (Tysons). | 2.0 GB |
| M5.13 | 2026-11-24 | Cleanup pass 3: lines at exits and lane drops, white left edge beside the Express, median barrier and double rail, exit / advance / gore signs. | 2.0 GB |
| M5.12 | 2026-11-23 | Cleanup pass 2: exits reach their streets with ways back to the Beltway; U-turns and turnarounds at road ends; VA 27 at the Pentagon; Springfield Express northbound; Spout Run Parkway. | 2.4 GB † |
| M5.11 | 2026-11-23 | Cleanup pass 1: ramp joins held to the parent road's surface; lane-width snaps, multi-lane steps and short dips removed; walls and parapets off the driving surface; reproducible profile. | 2.3 GB |
| M5.10 | 2026-11-23 | Spawn moved out from under the Beltway bridge (16 slots on VA 123 in the open); VA 123 through Tysons and the Jones Branch / Westpark loop (m5.9). | 2.3 GB |
| M5.9 | 2026-11-23 | VA 123 through Tysons (Route 7 to the Dulles Toll Road) and the Jones Branch / Westpark loop; exit 46 loops joined to 123; 16 spawn slots under the Beltway (loaded on the deck above); server kit. | 2.3 GB |
| M5.8 | 2026-11-23 | GW Parkway built whole (Beltway to I-395 at the Pentagon), all of I-395 and the 395 Express Lanes, and the Cabin John – Clara Barton – Chain Bridge – VA 123 loop; locator map window. | 2.2 GB |
| M5.7 | 2026-11-23 | Westpark Drive Express Lanes link bridge built; at-grade junctions paved across (92); Leesburg Pike carried 30 m through the Route 7 junction. | 2.0 GB |
| M5.6 | 2026-11-23 | Ramps that meet a street on its overpass connect (parapet opened where they join); the wedge gap at an angled ramp end is paved (Jones Branch Connector, Tysons). | not archived |
| M5.5 | 2026-11-23 | Median barrier between the inner and outer loops runs level with the road (was following the bumpy median terrain); buried footing where the ground dips. | not archived |
| M5.4 | 2026-11-22 | Guard rail along the freeways and ramps (698 km) with median crossovers and gaps; rail ends flared, run in to bridge parapets. | 2.0 GB |
| M5.3 | 2026-11-21 | Ramp gores held to the parent road's surface (no steps or dividers); shoulders trimmed beside roads at another level; junction corners smoothed. | 1.9 GB |
| M5.2 | 2026-11-21 | Interchanges built out to 3 km (I-95/I-395, I-66, I-270, US-50, the parkways ...: 592 roads, 837 km); building types from land use. | 1.9 GB |
| M5.1 | 2026-11-21 | Bridge decks from USGS LiDAR (M4 step 3); trees (173k) and buildings (44k) along the Beltway. | 1.2 GB |
| M4.4 | Night lighting (CSP) for the street lamps; build notes in Content Manager. | not archived | |
| M4.3 | Pavement markings: white/yellow edge lines, dashed lane lines, double yellow on two-way streets. | not archived | |
| M4.2 | Furniture: median and step barriers, guard rails, retaining and noise walls, lamps, power lines, 100 exit sign gantries; closure barriers removed. | not archived | |
| M4.1 | Crossing roads (250 m stubs) and the structure kit: bridge girders, parapets, fences, piers, abutments. | not archived | |
| M3 | Graded terrain with orthophoto ground around the whole loop. | not archived |
Full notes: Changelog. Check a download with certutil -hashfile <zip> SHA256 (Windows) against the SHA-256 shown.