Floor it
Rendered in Blender from the same model that ships to Assetto Corsa. Click one to see it big.




Bring 15 friends
A server takes 16 cars. Everyone spawns on VA 123 next to the Beltway bridge in Tysons, in four groups of four, with the exit 46 cloverleaf right there. Where you go from there is between you and the Express Lanes. A sample server config comes with the build.
Never miss your exit
The track has its own app, the DC Beltway Locator. Its map turns with the car and zooms out as you speed up, and the strip under it tells you the road you're on and how far it is to the next exit.
- Missed it anyway? Teleport to any exit, or to any point on the Beltway in 2 km steps.
- In practice mode, double-click a road on the map and you're on it.
- Paste coordinates from Google Maps, or from the pin you dropped on the Mixing Bowl, and it takes you there.
The Locator on the way into the Mixing Bowl, 0.7 miles out.
Pick a ramp, any ramp
This is every road in the build, 874 of them, drawn from the same data as the track. Click the map, then scroll or pinch to zoom; the exit numbers show up when you get close. Hover a road for its name. The yellow dot is a car lapping the Inner Loop at 60 times normal speed.
- Beltway I-495 · 228 km
- Express Lanes · 67 km
- Freeways · 253 km
- Parkways · 52 km
- Ramps · 339 km
- Crossing streets · 118 km
- A lap at a legal 70 mph:
Yes, it counted the trees
The build writes these down every time it runs (these are from m5.13.2). Each tree went where a satellite canopy map found one.
- I-495 Capital Beltway
Inner Loop 102.2 km Outer Loop 102.9 km All the way round 64 mi Six carriageways in all, with the 495 Express Lanes and the Wilson Bridge local lanes. - EXIT177exits
161 sign gantries, 103 of them cantilevered. - km of road1,057
874 roads: the Beltway, its interchanges out to 3 km, the parkways. - bridges645
1,243 pier bents, 415 abutments; deck heights from LiDAR. - 353ktrees
Placed from 959,101 crowns in a satellite canopy-height map. - km guard rail811
Plus 61 km of median barrier and 69 noise walls (45 km). - 4,625street lamps
5,917 lights, switched on at dusk by Custom Shaders Patch. - 98kbuildings
Extruded from 361,068 OpenStreetMap outlines. - triangles29.5 M
Over 45 × 37 km of terrain under 1,584 aerial-photo tiles.
The traffic chopper view
The bits that look best from 500 feet up.






How a map turns into a road
A Rust program does it in five stages and checks its own work as it goes. The ride check, for one, drives every curve at 70 mph and complains about any it couldn't hold. The stage with the yellow bar made the Mixing Bowl layer you're looking at.
- IngestOpenStreetMap, USGS elevation, LiDAR, aerial photos
- Centrelinesmooth lines fitted to the painted lanes
- Profileheights, banking, bridges clear of each other
- Meshroad, bridges, rail, signs, terrain, trees, buildings
- ExportFBX parts and CSP config for Assetto Corsa
The road
Fitted to the painted lines in aerial photos, with the real hills and banking from the USGS 1 m elevation model. A script checked every curve at 70 mph before you got there.
Bridges
Anything that crosses the Beltway is an overpass, with girders, parapets, fences, piers and abutments. The deck heights come from laser scans.
Roadside
W-beam guard rail with its gaps and median crossovers, a concrete median barrier, retaining walls, noise walls at their mapped heights, and power lines that sag between the towers.
Signs
Green exit gantries carrying the destinations OpenStreetMap has for them, in a Highway Gothic look-alike. Edge lines, dashed lanes, double yellow on the two-way streets.
Ground
Graded terrain stitched to the road edge and draped in state aerial photos from Maryland, Virginia and DC, colour-matched to one reference set (USDA NAIP).
Trees and buildings
Trees where a satellite canopy map found them, at the height it measured. Buildings pushed up from OpenStreetMap outlines, their type taken from the land use around them.
Night
The street lights are real light sources in Custom Shaders Patch: twin-arm poles down the Maryland median, ramp lights, lit gantries.
Parkways
The GW Parkway, Cabin John and Clara Barton get the parkway treatment: narrow shoulders, timber guard rail, woods right up to the edge, and no street lights at all.
Credit where it's due
It's all public data. The licences ask for credit, and the people behind it have earned it.
| OpenStreetMap | roads, exits, walls, buildings, power lines | ODbL |
|---|---|---|
| USGS 3DEP | 1 m elevation model and LiDAR point clouds | public domain |
| USDA NAIP | leaf-on colour imagery | public domain |
| State orthophotos | Virginia VBMP, Maryland iMAP, DC Ortho 2025 | various; DC: CC BY 4.0 |
| Meta & WRI | global canopy height map (trees) | CC BY 4.0 |
| Roadgeek 2014 | the sign lettering on this page | MIT |
Notes for testers
New in m5.13.2
- QA respin 2 of m5.13 (fixes from the m5.13.1 re-shoot; everything else as m5.13.1).
- Lane edge colour: a painted line took the colour of its first point for its whole length, so left edges stayed white or yellow for kilometres past where they should change. Each line now changes colour where it should: 51 km of left edge turns white to yellow (the longest a 36 km median edge from Springfield over the Wilson Bridge to Landover), 17 km yellow to white (the painted buffer between the outer-loop general lanes and the Express near Gallows Road and Tysons).
- Overhead signs: the 13 exit and advance signs lost in m5.13.1 (31A Wheaton, 28A White Oak, 28B Takoma Park, 176B Telegraph Road, the three I-395 exits at the Pentagon, and advance signs for 47A-B, 8A, 4, 5, 7A and 1C/1D) are back, still with no post in line with other pavement: where the usual spots had none, the sign moves upstream (356 overhead signs). The Pentagon exit signs stand 285-300 m before their exits, ahead of the approach bridge (posts cannot go on a bridge).
What to check
- Content Manager shows 'DC Capital Beltway (M5.13.2)', version m5.13.2.
- Gallows Road (exit 51) on both loops: the Express exit to Gallows Road (outer loop) reaches the Gallows Road bridge; the general-lanes exit 51 (inner loop) reaches Gallows Road.
- Lines at a few exits and entrances (any Beltway exit; also a left exit, e.g. the Express Lanes access ramps near Tysons): dotted mouth, ramp edge line across the shoulder, white V; nothing floating or sunk. Report a join where the lines look wrong with the locator's lat/lon.
- A lane drop on the Beltway: the lines stay straight, the dropping lane's line is dotted for the last 100 m.
- Median: drive a stretch where the median is narrow (I-395 north of the Pentagon, the Beltway in Maryland, Suitland Parkway): the barrier or the steel rail stands in the gap, not in a lane; it carries on under overpasses. Report any piece standing in a lane.
- Signs at three exits in a row: advance signs (1 MILE, 1/2 MILE) then the exit sign just before the gore, then the EXIT nn sign in the gore. Report a sign that blocks the road or faces the wrong way (signs have no collision).
- Content Manager / ksEditor: the sign textures load (6 atlases, as before).
- Re-shoot (QA 2): 47-48 painted buffer 38.87975, -77.22187: the line between the outer-loop general lanes and the Express is white, the Express's median edge yellow; 49 exit 31A Wheaton sign, now ~190 m upstream at 39.01329, -77.04357; 50 exit 28B Takoma Park sign 39.01946, -76.97716; exit signs 28A White Oak 39.01884, -76.97608, 176B Telegraph Rd 38.80094, -77.08475, Pentagon North Parking 38.88100, -77.05746, Pentagon Mall and River Entrance 38.87859, -77.05717, National Airport 38.87845, -77.05694; advance signs 47A-B 1/4 MILE 38.91895, -77.21744, 8A 1 MILE 38.84532, -77.08016, 4 1 MILE 38.81935, -77.13001, 5 1/2 MILE 38.83041, -77.11137, 7A 1/2 MILE 38.83972, -77.08554, 1C/1D 1/4 MILE 38.80039, -77.16621; left edge now yellow beside the median: Wilson Bridge ~38.795, -77.0, Maryland ~39.015, -77.13, 38.89, -77.20; pose 45 left edge still yellow.
How we got here
- M5.13.2
2026-11-24 · this buildCleanup pass 3 of 3: wayfinding (lines at joins, exit signs, rail between directions), QA respin 2.
- M5.13.1
QA respin: no ramp-end wedge above Georgia Avenue (31A); no gantry post at a gore nose (4A); left edge yellow where the Express is a separate roadway (Tysons).
- M5.13
Cleanup pass 3: lines at exits and lane drops, white left edge beside the Express, median barrier and double rail, exit / advance / gore signs.
- M5.12
Cleanup pass 2: exits reach their streets with ways back to the Beltway; U-turns and turnarounds at road ends; VA 27 at the Pentagon; Springfield Express northbound; Spout Run Parkway.
- M5.11
Cleanup pass 1: ramp joins held to the parent road's surface; lane-width snaps, multi-lane steps and short dips removed; walls and parapets off the driving surface; reproducible profile.
- M5.10
Spawn moved out from under the Beltway bridge (16 slots on VA 123 in the open); VA 123 through Tysons and the Jones Branch / Westpark loop (m5.9).
- M5.9
VA 123 through Tysons (Route 7 to the Dulles Toll Road) and the Jones Branch / Westpark loop; exit 46 loops joined to 123; 16 spawn slots under the Beltway (loaded on the deck above); server kit.
- M5.8
GW Parkway built whole (Beltway to I-395 at the Pentagon), all of I-395 and the 395 Express Lanes, and the Cabin John – Clara Barton – Chain Bridge – VA 123 loop; locator map window.
- M5.7
Westpark Drive Express Lanes link bridge built; at-grade junctions paved across (92); Leesburg Pike carried 30 m through the Route 7 junction.
- M5.6
Ramps that meet a street on its overpass connect (parapet opened where they join); the wedge gap at an angled ramp end is paved (Jones Branch Connector, Tysons).
- M5.5
Median barrier between the inner and outer loops runs level with the road (was following the bumpy median terrain); buried footing where the ground dips.
- M5.4
Guard rail along the freeways and ramps (698 km) with median crossovers and gaps; rail ends flared, run in to bridge parapets.
- M5.3
Ramp gores held to the parent road's surface (no steps or dividers); shoulders trimmed beside roads at another level; junction corners smoothed.
- M5.2
Interchanges built out to 3 km (I-95/I-395, I-66, I-270, US-50, the parkways ...: 592 roads, 837 km); building types from land use.
- M5.1
Bridge decks from USGS LiDAR (M4 step 3); trees (173k) and buildings (44k) along the Beltway.
- M4.4
Night lighting (CSP) for the street lamps; build notes in Content Manager.
- M4.3
Pavement markings: white/yellow edge lines, dashed lane lines, double yellow on two-way streets.
- M4.2
Furniture: median and step barriers, guard rails, retaining and noise walls, lamps, power lines, 100 exit sign gantries; closure barriers removed.
- M4.1
Crossing roads (250 m stubs) and the structure kit: bridge girders, parapets, fences, piers, abutments.
- M3
Graded terrain with orthophoto ground around the whole loop.
- M2
First drive: a grey 'ghost road' of the whole Beltway in Assetto Corsa.
- M1
Centrelines for the whole loop, fitted to the painted lines in aerial photos.





